Step 2c: Build pib’s Hand (Adv)
Tutorial: pib#5 HandPib's Hand consists of 4 3D-printed parts 4 fingers and 1 thumb. It can be assembled in the following 9 steps Before assembling the right hand, assemble 4 fingers and 1 right thumbs first. Assemble the left hand using the same steps in a mirrored orientation. I |
|
|---|
Overview: Needed Parts
3D Printable Parts:
| Non-printable Parts:
|
Overview: 3D Printable Parts
D01-R-Palm_right
| D30-R-Cover_hand_right
|
D11-R-Bearing_enclosure_right
| D65-R-Palm_skin_right
|
Step-by-Step Tutorial
Step 1: Print helpers | Difficulty: 2/5 |
Remove all print helpers from the printed parts. |
|
Step 2: Insert M3 Nuts | Difficulty: 1/5 |
Press two S01-M3_nut into D01-R-Palm_right. Needed Parts: 2x S01-M3_nut |
|
Step 3: Attach Thumb Assembly | Difficulty: 3/5 |
Attach the thumb assembly to D01-R-Palm_right. Insert the lower ball bearing into the hole and the upper ball bearing into the small recess. Needed Parts: 1x D01-R-Palm_right |
|
Feed the two fluorocarbon wires from the thumb through the small holes in D01-R-Palm_right. Insert the spring into the other small hole, as shown in the image. | |
Step 4: Secure Thumb Assembly | Difficulty: 1/5 |
Secure the thumb assembly to D01-R-Palm_right using D11-R-Bearing_enclosure_right, one S18-M2x20 screw, and one S19-M2_nut. Needed Parts: 1x D11-R-Bearing_enclosure_right, 1x S18-M2x20, 1x S19-M2_nut |
|
Step 5: Insert M2 Nut | Difficulty: 1/5 |
Press one S19-M2_nut into D01-R-Palm_right in the same orientation as shown in the image. Needed Parts: 1x S19-M2_nut |
|
Step 6: Attach Fingers | Difficulty: 1/5 |
First, feed the fluorocarbon wires through the holes in D01-R-Palm_right. Then attach the 4 fingers using one S18-M2x20 screw for each finger. Needed Parts: 4x S18-M2x20 |
|
Step 7: Attach Palm Skin | Difficulty: 1/5 |
Fit D65-R-Palm_skin_right onto D01-R-Palm_right. Needed Parts: 1x D65-R-Palm_skin_right |
|
Step 8: Install PTFE Tubes | Difficulty: 1/5 |
Feed each of the 6 fluorocarbon wires through one 100cm PTFE Tube. Then push all 6 PTFE tubes firmly into D01-R-Palm_right. Needed Parts: 6x 100cm PTFE Tube |
|
Step 9: Attach Hand Cover | Difficulty: 2/5 |
Clip D30-R-Cover_hand_right securely onto D01-R-Palm_right. Needed Parts: 1x D30-R-Cover_hand_right |
|
Congratulations! The Hand is AssembledE-Mail Support: team@pib.rocks | Discord: discord.gg/GRdpyeDu7P | Web: pib.rocks | Shop: shop.pib.rocks |